Industry newsIreland

Irish tolls rise again from 1 January, up to 30c a crossing for lorries

Transport Infrastructure Ireland has approved inflation-linked increases on the M50 and the eight PPP motorways. The Irish Road Haulage Association wants the Government to reverse them.

30cmore per crossing for the heaviest lorries on the M50 and most PPP toll roads from 1 January 2027

Transport Infrastructure Ireland announced on 30 October that tolls on the M50 and the eight PPP motorway schemes will rise from 1 January 2027, in line with the 3.6% rise in the consumer price index between August 2025 and August 2026. Heavier lorries pay 20c or 30c more per crossing on the M50. On the PPP roads HGVs pay 20c more, and four-axle vehicles over 3,500 kg pay 30c more, except on the M3 Clonee to Kells, where the rise is 10c. Cars go up by 10c on most roads, or 20c on the M50 without a tag or account.

At the Dublin Port Tunnel the southbound morning peak toll (6am to 10am, Monday to Friday) rises from €14 to €15; the other tunnel rates are unchanged and qualifying HGVs still pass free. TII told the Irish Times the approach was in line with recent years and cited rising peak traffic. HGV Ireland worked the numbers on 8 November: at four tolled crossings a day over 220 working days, a 30c rise costs €264 a truck a year, or €13,200 across a fleet of 50.

“The Government needs to intervene here and reverse this decision.”
Ger Hyland, president, Irish Road Haulage Association
“Enough is enough. Irish hauliers are not an unlimited source of revenue.”
Brendan Ryan, director, Martin Ryan Haulage, as reported by HGV Ireland

What it means for operators

  • Budget it: count your tolled crossings per truck per day; at 30c a crossing the rise is roughly €260 to €400 a truck a year before any route changes.
  • Rate cards: contracts that pass tolls through at cost need the new rates from 1 January; fixed-price work absorbs the rise unless it is renegotiated now.
  • The port tunnel: the €1 rise is on peak car traffic; HGVs using the tunnel to reach Dublin Port still pay nothing.

The IRHA has asked for a meeting with the Taoiseach. No Government response had been reported by 10 November.

Share this story

Share it on LinkedIn with your view to start the conversation.

Spotted something we should cover, or a correction? hello [at] museco.co.uk

Let’s talk about
your business.

Book a free, no-obligation demo and see how FleetInspect can transform your operations. One email is all it takes.

Email us

The link opens a ready-made email in your mail app. Tell us a little about your business and we’ll come back with demo times.

Prefer to call?
We reply within one working day